News

Drinking water purification plant for Jordan

GUGLER Water Turbines GmbH receives an order from GDF Suez-Degremont for the supply of one Francis turbine, generator, butterfly valve and the appertaining electrical control and governing system for the ...

Italy – further success on a difficult market

EPF Energy places a further order with GUGLER Water Turbines for the supply of one small vertical Kaplan turbine with belt drive.

Indonesia – Major order for Cibareno and Krueng Isep

GUGLER Water Turbines received significant orders for two Francis and two Pelton Turbines.

Residual water turbine for Panama

GUGLER Water Turbines obtains a follow-up order from the Russian company Energomachexport Corporacion LLc for the hydropower plant Baituna in Panama.

Peru – Francis Turbines for 13 MW hydropower plant

Union Andina de Cementos SAA (UNACEM) placed the order with GUGLER Water Turbines for the supply of the entire electro-mechanical equipment for the hydropower plant Carpapata III.

France – Kaplan Turbine for EdF

GUGLER Water Turbines was awarded a further contract from Europe’s largest utility Electricite de France (EdF) for the hydropower project Strasbourg.

Latvia – Follow-up order for HPP Brenguli

GUGLER Water Turbines receives the order for the supply of a second vertical Kaplan turbine with an output of 118 kW with direct coupled generator for the existing small hydropower ...

Switzerland – Horizontal Kaplan Pit Turbine for Hagneck

The company BKW FMB Energie AG located in Bern places an order with GUGLER Water Turbines for the supply of one horizontal Kaplan Pit tubine for the ecological flow hydropower ...

Macedonia – Consolidation of the leading market position

GUGLER Water Turbines consolidates its market position in Macedonia with orders for five additional hydropower plants.

Successful Commissioning in the 1st half of 2013

Activities in Macedonia, Panama, Romania, Albania and Italy