GUGLER Water Turbines
Francis-Turbines

We supply Francis-turbines up to a 40 MW per unit.
For medium head applications with medium flow.

Individualised design at state-of-the-art technology provides highest efficiency, longest lifespan and secures extraordinary profitability.

We provide for every application the perfect solution:

  • as Open-flume turbine for low head
  • with a spiral casing for medium head
  • as horizontal and vertical design

The Francis runner will be machined out of a forged monoblock of stainless steel.  For larger runners, a welded version can also be made available.

 

You might also be interested in these Projects:

Nam Tha 4, Vietnam, 2020

Scope of Supply: Francis Turbine, Generator, HPU, Inlet valve

Number of Units
2
Total Output (kW)
17 468
Head of water (m)
194,0
Flow (m3/s)
4,9
Runner Diameter (mm)
725

Tanjung Tirta, Indonesia, 2019

Scope of Supply: Francis Turbine, Butterfly Valve, HPU, Generator, Control & Protection Systems, SCADA

Number of Units
2
Total Output (kW)
10 000
Head of water (m)
92,3
Flow (m3/s)
6,0
Runner Diameter (mm)
850

Marañon, Peru, 2015

Scope of Supply: Francis Turbine, Butterfly Valve, HPU, Generator, all Electrical Switchgears, Control & Protection Systems, SCADA, Transformers

Number of Units
3
Total Output (kW)
19 683
Head of water (m)
84,5
Flow (m3/s)
8,7
Runner Diameter (mm)
1 115

Alejandria, Colombia, 2014

Scope of Supply:

Number of Units
2
Total Output (kW)
15 378
Head of water (m)
106,5
Flow (m3/s)
8,0
Runner Diameter (mm)
930

Carpapata III, Peru, 2014

Scope of Supply: Francis Turbine, Generator, Inlet Valve, Hydraulic Power Unit

Number of Units
2
Total Output (kW)
12 874
Head of water (m)
113,8
Flow (m3/s)
6,4
Runner Diameter (mm)
910

Stubenberg, Austria, 2015

Scope of Supply: Francis Turbine, Inlet Valve , Bifurcation, Generator, Hydraulic Power Unit

Number of Units
2
Total Output (kW)
1 698
Head of water (m)
23,4
Flow (m3/s)
4,0
Runner Diameter (mm)
850