Refurbishment of existing power plants reduces interruptions and operating costs and increases power production significantly, hence the total efficiency and return-on-investment.
We provide the perfect solution for every application:
Increased output and efficiency with new turbine runners
Improved Automation Systems
Increased reliability and availability
Lower operation and maintenance costs
Extension of the lifespan of the power plant
Stubenberg, Austria, 2015
Scope of Supply: Francis Turbine, Inlet Valve , Bifurcation, Generator, Hydraulic Power Unit
Number of Units
2
Total Output (kW)
1 698
Head of water (m)
23,4
Flow (m3/s)
4,0
Runner Diameter (mm)
850