In November 2020 GUGLER commissioned DEANSTON hydropower plant at Deanston Distillery in the UK.
The GUGLER Kaplan Turbine is designed for an output of 355kW at 4,2m³/s flow.The head of water is 9,2m.
GUGLER supplied the Kaplan tubular turbine with runner diameter of 900mm, the generator and the hydraulic power unit.