[COUNTER_NUMBER id=8761]
For almost 100 years, our family has been dedicated to the development and construction of water turbines, small hydropower plants and the generation of electricity from hydropower.
With more than 1,000 successfully installed turbines, the third-generation GUGLER family is one of the world’s leading suppliers of water turbines in the range from 5 kW to 40 MW.
More detailed information about selected references can be found in the interactive world map below.
The 10.4 MW Hydropower Project Lintau in Indonesia has been successfully commissioned. This project, located in the Lintau Buo sub-district of West Sumatra, signifies a step towards cleaner energy generation in Indonesia.
Together with Shizen Energy Inc., we have installed a 2.2 MW Pelton turbine and synchronous generator to the Kuroda Hydroelectric Power Plant (Toyota City, Aichi Prefecture) of Chubu Electric Power Co., Inc. (Chubu Electric Power). The newly installed turbine started full-scale operation in April 2023.
Annual electricity sales income of 46 million yen expected. The profit to be used to improve the local water supply system.
GUGLER Water Turbines GmbH has signed a major contract for the design, manufacture, transportation, supervision of installation and commissioning of a 6-jet vertical Pelton turbine with all necessary electromechanical equipment (including the large transformers for the Santa Ana and Campas substations) for the Anashironi hydropower project.