[COUNTER_NUMBER id=8761]
For almost 100 years, our family has been dedicated to the development and construction of water turbines, small hydropower plants and the generation of electricity from hydropower.
With more than 1,000 successfully installed turbines, the third-generation GUGLER family is one of the world’s leading suppliers of water turbines in the range from 5 kW to 25 MW.
More detailed information about selected references can be found in the interactive world map below.
GUGLER successfully commissioned two vertical six-nozzle Pelton Turbines for HPP Güce in Turkey.
GUGLER Water Turbines recently signed new contracts for six Francis turbines in Vietnam and the Philippines.
In November 2020 GUGLER Water Turbines has successfully completed the refurbishment of the existing hydropower plant Duved.
The Board of Water Works of Pueblo in Colorado has awarded the contract for the design, supply, supervision of installation and commissioning of two Francis turbines with a capacity of 500 kW and 1000 kW for the Whitlock water treatment station.