Zu den Turbinen

Kaplan-Turbines

Francis-Turbines

Pelton-Turbines

Quick inquiry

GUGLER Water Turbines – worldwide

[COUNTER_NUMBER id=8761]

For almost 100 years, our family has been dedicated to the development and construction of water turbines, small hydropower plants and the generation of electricity from hydropower.
With more than 1,000 successfully installed turbines, the third-generation GUGLER family is one of the world’s leading suppliers of water turbines in the range from 5 kW to 40 MW.

More detailed information about selected references can be found in the interactive world map below.

A Master’s Thesis at GUGLER

A Master’s Thesis at GUGLER

Ideas into action: Find out how a master's thesis project at GUGLER is leading to smarter, more efficient hydropower solutions.

Nam Cuoi Hydropower Plant commissioned

Nam Cuoi Hydropower Plant commissioned

The Nam Cuoi is fully operational with 2 Francis turbines designed for delivering 12 200 kW.

Moco Moco Hydropower Plant Restored

Moco Moco Hydropower Plant Restored

Following its complete refurbishment, the Moco-Moco hydropower plant is now in operation with increased output and two Pelton turbines and is supplying Lethem with renewable energy.

A new hydropower plant for Zimbabwe

A new hydropower plant for Zimbabwe

Officially completed in November 2024, this project represents a significant milestone in expanding Zimbabwe’s renewable energy capacity.