PCH DON TITO
The installed capacity of this new Pelton turbine is 3,091 kW and will be designed for a net head of 173.2 m and a total flow rate of 2.00 m3/s.
GUGLER Water Turbines GmbHGewerbepark 41, 4101 Feldkirchen an der Donau, Austria+43 7233 20933, info@gugler.com
All rights reserved © GUGLER Water Turbines GmbH