Refurbishment

Refurbishment of existing power plants reduces interruptions and operating costs and increases power production significantly, hence the total efficiency and return-on-investment.

We provide the perfect solution for every application:

  • Increased output and efficiency with new turbine runners
  • Improved Automation Systems
  • Increased reliability and availability
  • Lower operation and maintenance costs
  • Extension of the lifespan of the power plant

 

Stubenberg, Austria, 2015

Scope of Supply: Francis Turbine, Inlet Valve , Bifurcation, Generator, Hydraulic Power Unit

Number of Units
2
Total Output (kW)
1 698
Head of water (m)
23.4
Flow (m3/s)
4
Runner Diameter (mm)
850